Heavy industrial plant served by Fluidline equipment
Projects & Case Studies

Installations that
are still running.
Documented.

A selection of Fluidline projects across refineries, cement plants, sugar mills and recycling yards — what the site needed, what we engineered, and how the equipment has performed since.

Case Studies
4
Sectors
4
Installations
1k+
Building Since
2001
01 · Selected Work

Proof,
not
promises.

Every case study on this page describes a real installation: the duty the customer specified, the engineering decisions we made, and the numbers the equipment has delivered since commissioning. We do not name customers on public pages — the plants, tonnages and dates below are described only as far as our customers are comfortable with.

These four projects were chosen because together they cover the core of what Fluidline does: grabs engineered around an existing crane, a heavy-duty EOT built for continuous operation, a complete cane unloading system delivered inside a fixed seasonal window, and a retrofit that saved a customer from replacing a crane that was still perfectly serviceable.

If your application resembles any of them, the engineering conversation is already half done — tell us your duty cycle and we will take it from there.

Have a similar
duty cycle in
your plant?

Send us the application — material, tonnage, cycle rate, and what the equipment has to survive. Our engineering team will respond with a technical proposal, not a brochure.